Floodplain Modeling
Apr 20 2011
Bild des Benutzers TeachEngineeringDigitalLibrary
Source: TeachEngineering Digital Library
4.25
Summary Information

Keywords:

disaster, flood, floodplain, geography, hazard, house, landform, landslide, levee, model, natural disaster, rain, river, riverbed, water

Estimated Time Required:

2-3 hours

Diversity Indicators:

This lesson requires fine motor skills to cut and shape the model houses. Keep this in mind when grouping students.

Tab Wrapper

0
Average: 4.3 (4 Bewertungen)
X